SYSTEM FAILURE / ACTION REQUIRED

Turn failure
into recovery.

Component-level inverter and UPS repair for installers and operators who cannot leave a failed unit unresolved.

Durban repair facilityNational intake by approved quoteUp to 10 kWTrade relationship protectedDurban repair facilityNational intake by approved quoteUp to 10 kWTrade relationship protected
01 / IMPACT SIGNAL

Not every failure
hits the same.

The intake captures business impact without inventing a turnaround promise. Urgency informs triage; assessment still determines the work.

How hard has this failure hit?

A failed spare unit and a failed production-critical unit need different context. Give the repair desk the signal before the equipment arrives.

High impact
Spare capacityOperation affected
02 / RECOVERY LANE

Four gates.
Zero guesswork.

Signal

Build the technical picture.

Capture unit details, fault behaviour, urgency and logistics in one structured request.

Receive

Make custody explicit.

Courier may be facilitated. PowerBench responsibility starts at formal facility acceptance.

Authorise

Control the spend.

Assessment is capped. Repair waits for a recorded instruction to proceed.

Release

Close with evidence.

Working-video evidence where practical, full payment, then collection or return delivery.

Signal
the fault.

Start with what you know. The guided intake creates a durable PB reference and routes the job to the Durban repair desk.

Quick intake preview · 01 / 05
What best describes the unit’s current state?
No AC output
Intermittent shutdown
Visible fault code
Not sure yet
Continue to unit details